Pictures from the Teraflop installation 10/11 2004
|

09:50: In the beginning there were only floorspace. This is also
the view of the web-cam which had more than 750 visitors during the day. Sølvi is preparing the cables
for what is about to come.
|
|

09:55: Last pep-talk before the action.
|
|

10:00: Rack one is installed by Roy, Maria and Steinar. Soon all
the 49 HP rx4640 machines will be in place. Each node has 4 1,3 GHz Itanium2
processors and 4 GB of memory. Aggregated performance for the new cluster
is 1,02 Teraflop. With the old equipment in addition it's a total of 1,16
Teraflop.
|
|
 
10:05: Eirik and Maria are getting the second rack. The chiefs
wisely decide to keep their hands in their pockets. IT-director Magnar
Antonsen to the left.
|
|

10:15: Eirik, Tor and Roy install rack three.
|
|
 
10:15: Steinar is mounting the front of the rack, while Sølvi
handles the cables at the back. Eirik and Maria are ready to get going with the next rack.
|
|

10:20: Our biggest investor is paying us a visit. Tor looks really
happy to see Santa. Maybe the last piece is in his sack? Roy on the other hand look anxious
to get his hands on the gigabit switches on the table.
|
|

10:40: Roy is connecting the three Gigabit switches.
|
|

10:45: Maria is watching while Eirik and Sølvi get the networking
in place. At this point the front-end infrastructure is about to be switched
to the new networking equipment.
|
|

11:15: Roy is ready to "Rocks and Roll". Each node took
about 15 minutes to upload with Rocks.
By then it was completely installed with software and tools ready to be
inserted into the compute-pool. Installation of Rocks was done in parallel
as soon as the nodes were turned on. The white rack to the left is the
old cluster. At the top seven rx2600's which will be returned to HP as
part of the deal. At the bottom the two rx5670's (similar specs to the
compute nodes) that are going to be reserved for interactive use in the
future.
|
|

11:55: Svenn is posing in front of the cluster. He looks very satisfied.
The first user job has just started on the new nodes. Steinar looks a
bit more concerned in the background, one of the nodes did not boot "out of the box".
|
|

12:30: Maria scissorhand goes to work. Some of the labels obviously
need to be changed. This is rack 3 which you can see in the other pictures
has no machine installed at the top. Instead it has three gigabit switches
mounted towards the back.
|
|

13:55: Sølvi and Maria celebrates 1 Teraflop up and running.
Only three hours from now the system-load will reach staggering 73%.
|
|

14:30: The Teraflop cake is being consumed in parallel. From left:
Eirik Fossgaard, Roy Dragseth, Steinar Trædal-Henden, Svenn Hanssen,
Sølvi Bersås, Tor Johansen and Maria Wulff-Hauglann.
|
|

14:35: All the good helpers get their share. Jan Andreassen (cutting
cake) and Martin Eilertsen were responsible for the web-cast. In the background
Børge Brunes who had a hand in the networking part.
|
|
All pictures © by Lars Slettjord (UiT)
|
| |